When undertaking a project there are many obvious costs to budget for, including Planning and Building Control fees, Structural Engineer fees, Architect fees and the cost of the works but quite often the cost of complying with the Party Wall etc. Act 1996 is not factored in. This is usually because people wrongly assume it is optional until a neighbour raises the issue or because they simply are not aware of the Act. The Party Wall etc. Act 1996 is not optional and notice must be served before undertaking notifiable works.
In this article, we aim to briefly set out how the fees are calculated for the various Party Wall Surveyors and what is ‘reasonable’. In normal circumstances, the Building Owner (the person carrying out the works) is responsible for the fees of their Surveyor and the Adjoining Owner’s Surveyor. This is not always the case, for example if there is a party fence wall (i.e. a boundary wall that is jointly owned) that is in disrepair due to lack of maintenance from both parties, then the cost of the making of the Party Wall Award and the cost of the repairs will be defrayed equally. If a party wall is damp on once side, then the person tanking the wall from their side will be responsible for the fees and repairs and the neighbour will be responsible for their side and any Award associated with their works.
Building Owner Costs
The Building Owner will usually provide their architect’s/engineer’s drawings to Party Wall Surveyors to obtain quotations to act as their Party Wall Surveyor for their project. It should be noted that Party Wall Surveyors can only quote for the various scenarios that may occur following the service of notices but will usually provide their hourly rate to deal with matters that may occur outside the original scope of service quoted for, such as dealing with damage to a neighbour’s property or a request for Security for Expenses.
Generally, the items a Party Wall Surveyor will initially provide a quotation for include:
- Serving of valid party wall notices
- Agreeing Party Wall Awards
- Undertaking schedules of Condition to neighbouring properties (this is sometimes included in the cost of the Award as this item will form part of the Award)
As mentioned above, there are a number of other costs associated with carrying out a project and whilst it may be tempting to proceed with cheapest quotation, you can end up with higher costs overall due to lack of experience in dealing with the complexities of the Party Wall etc. Act 1996. For instance, if the Adjoining Owner’s Surveyor has to re-write the draft Party Wall Award that is simply an amended basic template, their fees will be higher to reflect this work, which will be borne by the Building Owner. Furthermore, an experienced Party Wall Surveyor can advise during the design stage and work with your architect to remove potential issues from the designs that will save money on party wall fees or maximise the space for a rear extension by advising on the demolition and rebuild of a party fence wall.
Adjoining Owner Costs
As mentioned above, in normal circumstances, the Building Owner pays for the reasonable cost of making the Award, which includes the Adjoining Owners Surveyor. The Adjoining Owner’s Surveyor may also make further appointments for more complex projects, such as a Structural Engineer or an Acoustician. Again, these costs are usually borne by the Building Owner.
Adjoining Owner’s Surveyors fees are usually calculated on an hourly rate basis, and will include the following:
- Review of the proposed works and any access requirements as may be required
- Inspection of the Adjoining Owner’s property to carry out a schedule of condition and review the proposals in relation the property
- Make any further appointments as necessary to review the proposals
- Review and make comments on the Award
A Surveyor’s hourly rate typically ranges from between £100 -£400 per hour depending on location and experience. The Building Owner’s Surveyor will expect a Surveyor with a higher hourly rate to carry out tasks more efficiently and they will often utilise the services of a junior member of the team to keep their fees reasonable.
The Building Owner’s Surveyor should also ensure that the fees incurred by the Adjoining Owner’s Surveyor are reasonable as they must be proportionate to the works being undertaken. This means that often the Adjoining Owner’s Surveyor may not be able to recover all of their fees in the Award and it will depend on whether they have a contract in place with the Adjoining Owner to cover this occurrence.
Third Surveyor Fees
If a matter gets referred to the Third Surveyor to resolve a dispute, typically costs follow the event and whichever party the Third Surveyor agrees with, their fees will be Awarded against the other party. This is not a cost the appointed Surveyors will bear but either the Building Owner or Adjoining Owner will, so it is always worth asking your Party Wall Surveyor to discuss with you, any referral they wish to make before they make it. Likewise, bear this in mind if you wish to make a referral directly to the Third Surveyor yourself.
Conclusion
In summary, Party Wall Surveyors fee should be proportionate to the works undertaken but having an experience Party Wall Surveyor appointed will be worth the cost. For the Building Owner this may be in providing advice at the design stage or efficiently agreeing the Awards to allow the works to proceed within programme or for the adjoining owner, by reviewing the proposals to ensure they do not have an adverse impact on your property. When seeking to appoint a Party Wall Surveyor, you should ask them how many instructions of this nature they have undertaken previously and obtain a clearly defined scope of service they will be providing, whether that’s for the Building Owner or Adjoining Owner and where possible, make clear that any additional costs are to be agreed before they are incurred.